We recently conducted a #verification of 6.850 MWe #hydroelectric power plant in Basak, Turkey. The project has three units of Francis Turbines (2X2.8 MWe and 1X1.25 MWe).
This is the filtered list of Related Fields under the Latest News page of Carbon Check.
We recently conducted a #verification of 6.850 MWe #hydroelectric power plant in Basak, Turkey. The project has three units of Francis Turbines (2X2.8 MWe and 1X1.25 MWe).
The grouped project consists of the adoption of the Wonderbag heat-retention cooking devices in kitchens throughout the Republic of South Africa. The Wonderbags allow for slow cooking of nutritious meals in an easy, safe and energy efficient manner. Wonderbags have health, social and environmenta
This was the 1st #VCS verification for the project activity. It is a biogas-to-energy project that will generate #renewableenergy by capturing biogas from animal manure -via anaerobic digestion- and utilizing it to produce thermal and electric energy through biogas systems.
The project's main objective is to provide safe drinking water by rehabilitating the #boreholes in Anseba and Debub district of Eritrea. The project activity provides access to quality water through rehabilitated boreholes.
The primary goal of the project activity is to generate green & clean electricity through #solarenergy. The project activity started to operate in May 2019 with the full capacity of 50MW.
Our team has successfully conducted #validation of #VERRA plastic waste reduction project in Colombia.
We are thrilled to share an exciting update from our team at Carbon Check!
The proposed project activities’ main goal is a production of the clean electricity and delivery of this electricity to the Egyptian national power grid in order to reduce the consumption of the #fossilfuels in Egypt.
Carbon Check celebrates International Day for conservation of Mangroves ecosystem.